Australian Capital Territory
Indesco was engaged by the Suburban Land Agency to undertake detailed design and documentation, including construction support services (RFI) for the new road bridge delivered for Taylor Estate, Stage 4. The bridge consisted of a dual span of 15m.
Due to its radial curve a custom profile Multi-strand Post-tensioned design solution was developed to meet the requirements of AS 5100. The final profile/Balustrade design and column selection was driven by coordination with the landscape architectural team to ensure the design matched the theme of the subdivision.