Turner office upgrade

Turner office upgrade

Location

Australian Capital Territory

description

Existing floor plates showed signs of excessive deflections.

• Analysis concluded existing floor beams fell short of required capacity in strength.
• Design had to take into consideration existing services that would remain.
• Combination of UC steel sections/Flat plate and columns were added to increase the strength capacity of the floor system prior to a levelling compound applied.