"Our reliability is a key factor for our clients managing their own corporate and project risk"

Northshore Apartments

Northshore Apartments

consultancy

Structural Engineering, Civil Engineering, Building Hydraulics

Location

ACT

description

Scope of Works
Structural Engineering
- Post Tension Design
- Shoring Design
- Value Engineering
- Temporary Works Design
Civil Engineering
Building Hydraulics
Precast Panel Shop Drawings

A six storey development with single basement (split with car stackers). Below water table designed as water tight basement. Polished precast facade. Post tension suspended slabs.

Due to a range of off white, Grey and polished off white precast panels where used on this project. great attention needed to be placed on the polished panels to ensure cracking would not occur during the polishing process as the panels hand to be polished on all 4 sides. allowance for the panels to be flipped and rotated in multiple different directions. Slab rebate layout was also carefully selected to ensure no cracking occurred in the panel at slab height.