"Our reliability is a key factor for our clients managing their own corporate and project risk"

IVY – Woden

IVY – Woden

consultancy

Structural Engineering

Location

ACT

description

Scope of Works
Structural Engineering
- Post Tension Design
- Shoring Design
- Value Engineering
- Temporary Works Design
Precast Panel Shop Drawings

This large residential development consists of 274 units rising 18 storeys vertically. Initial input by Indesco led to the elimination of the transfer structures which led to significant cost savings along with an improved build ability. The slab system consists of post tension flat plates with the lateral support provided by three cores. lateral analysis was undertaken to ensure occupant comfort limitations under serviceability wind conditions were satisfied.

The curved precast balustrades where documented in 3D with the traditional methods re-written to suit the project.