Bonner 3 Estate

Bonner 3 Estate

description

Ondesco was engaged by the LDA to prepare the EDP and DA documentation for a 650 lot subdivision in Bonner, ACT. The design team for the EDP and DA included some of the specialist subconsultants nominated in this submission. Indesco was then subsequently commissioned to prepare the detailed design of the estate in 3 stages.

Indesco was also awarded the commission to provide construction phase services (contract administration and construction surveillance) for the construction of the estate in 3 concurrent packages in addition to the adjacent collector road (Roden Cutler Drive) and a trunk sewer.
As the construction packages (3 estate packages plus 1 road package) were each awarded to different contractors, a unique challenge was the management of adjacent works and the resolution of integration of interface issues.